# Obra pública: Contrato de obra pública

- **Título oficial / radicado:** Contrato de obra pública
- **Corporación:** Guías y Manuales CCE
- **Tipo:** Guía / Manual
- **Fecha:** 2024-08-27
- **Número:** Contrato de obra pública
- **URL canónica en Adjudika:** https://adjudicalo.com.co/documento/cce_guias:guia_manual:1206
- **PDF oficial:** https://www.colombiacompra.gov.co/wp-content/uploads/2024/08/cce_contrato_de_obra_publica-engl-1.pdf
- **Fuente oficial:** https://www.colombiacompra.gov.co/archivos/manual/contrato-de-obra-publica

## Puntos clave

- Guías y Manuales CCE
- Obra pública
- Contratos

## Extracto

Colombia Compra Eficiente pone a disposición el presente documento tipo de contrato de obra pública y recomienda su uso en Procesos de Contratación que se adelanten por licitación pública o selección abreviada. The sections between brackets correspond to blank spaces to be filled. The terms not defined in the aforementioned documents or in this clause, must be construed according to their natural and obvious meaning. Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].

## Descriptores temáticos

Guías y Manuales CCE, Obra pública, Contratos

## Decisiones relacionadas

- [Guías y Manuales CCE — Obra pública: Contrato de obra pública tipo para contratos plan](https://adjudicalo.com.co/documento/cce_guias:guia_manual:1213.md)
- [Guías y Manuales CCE — Liquidación de contratos estatal: la liquidación contratos estatales](https://adjudicalo.com.co/documento/cce_guias:guia_manual:1240.md)
- [Guías y Manuales CCE — Fiducia: Contrato de fiducia para el manejo de anticipos](https://adjudicalo.com.co/documento/cce_guias:guia_manual:1209.md)
- [Guías y Manuales CCE — Comodato: Contrato de comodato](https://adjudicalo.com.co/documento/cce_guias:guia_manual:1181.md)

## Texto del documento

Título: Contrato de obra pública
Corporación: Colombia Compra Eficiente
Descriptores: Guías y Manuales CCE, Obra pública, Contratos

Colombia Compra Eficiente pone a disposición el presente documento tipo de contrato de obra pública y recomienda su uso en Procesos de Contratación que se adelanten por licitación pública o selección abreviada. El documento tipo debe adaptarse a las condiciones particulares del Proceso de Contratación.

Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
The function of Colombia Compra Eficiente is to design and implement standardized document s specialized per type of goods or services that may be required by the participants in the public purchases and procurement system . The purposes of these documents are to be the guideline for the State Entities.
Colombia Compra Eficiente makes available this work contract sample document pursuant to plan contracts, the use of which is mandatory for the State Entities that are going to enter into plan contracts in the terms of Circular letter 15 of the 28th of August of 2014, issued by Colombia Compra Eficiente. The sample document must be adapted to the particular conditions of the Procurement Process. The sections between brackets correspond to blank spaces to be filled.
Table of Contents Clause 1 – Definitions ......................................................................................................................... 3 Clause 2 – Purpose of the contract ..................................................................................................... 4 Clause 3 – Specific Activities of the contract ...................................................................................... 4 Clause 4 – Contract Price and Terms of Payment .............................................................................. 4 Clause 5 – Contractor’s representations ............................................................................................. 5 Clause 6 – Works’ Term and Schedule ............................................................................................... 6 Clause 7 – Contractor’s Rights ............................................................................................................ 6 Clause 8 – Obligations of the contractor ............................................................................................. 6 Clause 9 – Rights of the Contracting State Entity ............................................................................... 7 Clause 10 – Obligations of the Contracting State Entity ..................................................................... 7 Clause 11 - Responsibility ................................................................................................................... 8 Clause 12 - Confidentiality .................................................................................................................. 8 Clause 13 – Unilateral termination, amendment and interpretation of the contract ............................ 8 Clause 14 – Forfeiture ......................................................................................................................... 8 Clause 15 – Fines ............................................................................................................................... 8 Clause 16 – Penalty clause ................................................................................................................. 8 Clause 17 – Guarantees and Risk Hedging Mechanisms .................................................................. 9 Clause 18 – Contractor’s independence ............................................................................................. 9 Clause 19 – Assignments .................................................................................................................... 9 Clause 20 – Subcontracting .............................................................................................................. 10 Clause 21 - Indemnity ....................................................................................................................... 10 Clause 22 – Force Majeure and Fortuitous Event ............................................................................. 10 Clause 23 – Resolution of Controversies .......................................................................................... 10 Clause 24 - Notifications ................................................................................................................... 11 Clause 25 - Supervision .................................................................................................................... 12 Clause 26 - Inspection ....................................................................................................................... 12 Clause 27 – Annexes of the contract ................................................................................................ 12 Clause 28 – Legalization and performance ....................................................................................... 12 Clause 29 – Liquidation ................................................................... ¡Error! Marcador no definido. Clause 30 – Site and Contract’s Domicile ......................................................................................... 12 Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
Clause 30 – Site and Contract’s Domicile
The undersigned to wit : [Name of the representative of the Contracting State Entity], identified with [type of ID document] with [number of ID card] issued at [municipality in which the ID card was issued], in his / her capacity as [position of the officer representing the Contracting State Entity], appointed by [number of the administrative act of appointment ] dated on [date of the administrative act of appointment], position for which he was sworn in on the [date of entry to office], according to minutes N° [number of minutes ] dated on the [date of the minutes ], pursuant to the powers and functions contained in [provision that gives to the officer of the Contracting State Entity that signs the contract the power to do so. It can be the provision of creation of the Contracting State Entity or an act of delegation of functions] dated on [date of the competence provision], acting in the name and on behalf of [name of the Contracting State Entity ], with NIT [NIT (tax identification number) of the Contracting State Entity], which, for the purposes of this agreement is called [name of the Contracting State Entity] or Contracting State Entity , on the one had; and on the other, [name of the representative of the contractor or of the individual Contractor] identified with [type of ID document] with [number of ID card] issued at [municipality in which the ID card was issued] [acting in his / her own name] or [in capacity as – position or relationship with the Contractor] of the [name of the company or plural structure represented by him / her ] with Nit. [NIT number of the Contractor] and commercial registration No. [commercial registration number ], which, for the purposes of this agreement will be called [name of the company or plural structure represented by him / her ] or [name of the persona natural] or the Contractor, have agreed to enter into this Public works contract , taking the following considerations into account:
I. Whereas, the mission of [name of the Contracting State Entity] is [description of the mission of the Contracting State Entity] and the contract to be entered into is related to this mission because [justification general of the rationale for the execution of the contract],
II. Whereas, the need to be satisfied by the Contracting State Entity is [description of the requirement to be contracted],
III. Whereas, [name of the Contracting State Entity ] carried out the respective studies and prior documents,
IV. Whereas, the Offer of the Bidder called [name of the contractor] was the winner of the selection process as it met the conditions and requirements required by the [Bid Terms or invitation to bid] No. [identification of the Contracting Process in the SECOP],
V. Whereas, this Contractor was selected by a [public tender / abbreviated selection/ minimum amount] identified with N° [identification of the Contracting Process in the SECOP],
VI. Whereas, the activity to be contracted is included in the Annual Acquisitions Process, Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
VII. Whereas, in [number and date of the administrative act of awarding or identification of the acceptance of the offer] the Contracting State Entity awarded this Contract, and
VIII. Whereas, [include any other motivation that the Contracting State Entity wishes to include],
By virtue of the foregoing, the parties enter into this contract, which will be governed by the following clauses:
Clause 1 – Definitions
The capitalized expressions utilized in this Contract must be interpreted with the meaning assigned below. The terms defined are utilized in singular and in plural according to the context in which they are utilized. Other capitalized terms utilized must be construed according to the definition contained in Decree 1082 of 2015 and according to the meaning established in Bid Terms. The terms not defined in the aforementioned documents or in this clause, must be construed according to their natural and obvious meaning.
Definitions
Start Minutes Document that records the date, the conditions and the place in which the execution of the public works the subject of this Contract start. Final Receipt Minutes Document that records the date and conditions of the final delivery of the works.
Work Minutes Is the document in which the Contractor and the inspector identify and quantify the quantities, the percentage or in general, the progress of work done [In case that the contractual obligations are agreed with work item]
Technical Annex Is the document attached to this Contract, which describes the technical specifications of construction and / or maintenance, budget, project’s scope, locatio n and area of influence and activities and any other that the parties deem as relevant.
Prepayment Delivery of money by the Contracting State Entity to the Contractor to start the execution of the contract. It is not profit or earnings of the contractor and it must be managed according to the law. Contracting State Entity [Name of the State Entity that enters into this Contract] Contractor [Name of the individual or legal entity or of the plural structure Contractor] Contract Is this agreement. Estimated Work Schedule Is the Schedule submitted by the Contractor to execute this Contract. Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
Clause 2 – Purpose of the contract
The purpose of the contract is [general description of the contractual purpose] which includes [specific description of the contractual purpose].
The Process’ Documents are part of this Contract and also define the activities, scope and obligations of the contract.
Clause 3 – Specific Activities of the contract
The Specific Activities to be developed in the contract are as follows: [Include the activities that must be carried out by the contractor in the most precise manner possible].
The Contractor undertakes to perform the subject of this contract with the following technical specifications, [on top of those established i n the Technical Annex, if there is one; include the conditions applicable to the service in terms of quality, answer times, specific scopes, etc.]
Clause 4 – Contract Price and Terms of Payment
The amount of this Contract corresponds to the sum of [include the total amount in numbers and in letters] which will be paid taking into account that the price was agreed by means of [ establish as a function of the payment modality adopted, namely, unit prices, lump sum or delegated management].
[The Contracting State Entity ] shall pay to the Contractor the amount of this Contract against the budget availability certificate [information of the budget availability certificate] and in case that future fiscal periods are used: the resources of future fiscal periods of [year of the periods] for [amount thereof], approved by [insert the competent body] on [date and data of the resolution of approval of th

*[... Sección intermedia resumida para contexto LLM; se conserva el tramo final resolutivo ...]*

ment, in a term of no more than five (5) business days as of the date in which one of the parties informs the other, in writing, of the existenc e of a difference and explains it in a brief manner.
The controversies that cannot be solved in a direct manner between the parties will be solved by means of: Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
[Amiable composition: when the controversy refers to technical issues, it can be subject to an amiable composition procedure, which will take place before [organizatio n that will process the amiable composition], once the request of direct arrangement has been filed. The amiable compositeur will be one (1) single person, who must have professional training in the management of the technical aspects of the works the subject of this contract and who will make a final decision in equity, mainly utilizing his / her professional training]
[Conciliation: when the controversial cannot be fixed in a direct manner [or if an amiable composition cannot exist] it must be subject to conciliation proceedings that will take place before [name of the conciliation center], once a conciliation request has been made in an individual or joint manner by the Parties. If in the term of eight (8) business days as from the start of the conciliation proceedings, which will be deemed as from the date of the first calling of the Parties made by [name of the conciliation center], the Parties do not reach an agreement to solve their differences, they must resort to [the contentious – administrative jurisdiction or the Arbitration Tribunal agreed]
[In case that an arbitration clause is agreed: The Arbitration Tribunal will operate in the city of [name of the city] and will be governed by the rules of the [ name of the Arbitration Center]. The Arbitration Tribunal will be made up by [one or three] arbitrator [s], who will be Colombian lawyer (s) and who will decide in law. The arbitrator [s] will be appointed by the Parties by mutual consent, and, in the absence of agreement, they will be appointed by [name of the Arbitration Center]. The lack of agreement about the appointment of the arbitrator s will be presumed if after then (10) business days after the application for the installation of the Arbitration Tribunal the [three (3)] arbitrator [s] has [have] not been appointed. The expenses caused by the Arbitration Tribunal will be covered by the Parties according to the applicable provisions in this regard.]
[The parties will bring the controversy to the Contentious - Administrative Jurisdiction]
The agreement reached in the direct arrangement stage, amiable composition, in the conciliation if such is the case and the arbitration award] is mandatory for the parties and are enforcement order. In consequence, any of the Parties can demand its enforcement in executive proceedings.
Clause 24 - Notifications
The notices, requests, communications and notifications that the Parties must make pursuant to this Contract must be in writing and will be deemed as duly made only if the same are personally delivered or sent by electronic mail to the person and the addresses set forth below:
[Name of the Contracting State Entity] Name: Position: Address: Phone: [Name of the contractor] Name: Cargo: Direction: Phone: Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
Electronic mail: Electronic mail:
Clause 25 - Supervision1
The supervision of the execution and of performance the obligations contracted by the Contractor in favor of the Contracting State Entity will be in the charge of [name of the supervisor]. 2
Clause 26 - Inspection
The Inspection of the execution and of performance the obligations contracted by the Contractor in favor of the Contracting State Entity will be in the charge of [name of the inspector].3
Clause 27 – Annexes of the contract
Are integral part of this contract the following documents:
27.1. The prior studies.
27.2. The Bid Terms of the selection process N°. [Number of the Contracting Process], its annexes, addenda or any other Document of the Process. 27.3. The offer made by the Contractor.
27.4. The minutes, agreements, reports and pre - contractual documents.
27.5. Budget availability certificate. [Include this document depending on the payment modality agreed by the parties].
27.6. [Include the other documents that the Contracting State Entity decides].
Clause 28 – Legalization and performance
This contract requires for its legalization the signature of the parties. For its performance it requires the budget registration [the approval of the guarantee the subject matter of Clause 16 of this Contract] and the accreditation of being the Contractor current and with no debts regarding the contributions to the integral social security system.
Clause 29 – Site and Contract’s Domicile
1 Pursuant to the provisions of Law 1474 of 2011, the Contracting State Entity must define if the follow – up of the contract is made through the so-called supervision, or through Inspection or both in a concurrent manner. In this last case, it is necessary for the Contracting State Entity to clearly define the works that correspond to the supervisor in respect to those of the Inspection. 2 Pursuant to the provisions of Law 1474 of 2011, the Contracting State Entity must define if the follow – up of the contract is made through the so-called supervision, or through Inspection or both in a concurrent manner. In this last case, it is necessary for the Contracting State Entity to clearly define the works that correspond to the supervisor in respect to those of the Inspection. (SIC) 3 In case that the Contracting State Entity has not contracted the Inspection at the time of execution of the works’ contract it must state the number of Contracting Process the purpose of which is to contract it. Public Works’ Contract [contract number] for the execution of the [project’s name] project dated on [Contract’s date], entered into by and between [name of the Contracting State Entity] and [Contractor’ name].
The activities set forth in this Contract will be carried out in [place or places of execution of the work] and the contractual domicile is [name of the city or municipality in which the contractual domicile will be established].
In witness whereof , it is signed at [place of execution of the contract ] on the [date of execution of the contract].
[Name of Contracting State Entity]
[Include the firma of the representative of the Contracting State Entity] [Name of the contractor]
[Include the firma of the representative of the contractor] [Data of the individual who signs it] [Data of the individual who signs it] [Type and number of ID] [Type and number of ID]